PLC Objective questions answers


                                   Objective questions answers
 (1) Hardwire control means?
(A) Controlling the hardware with the help of software.
(B) Controlling the plant with relays contactors etc. without any programmable controller
(C) Controlling the plant with relays contactors etc. with programmable controller
(D) None
 (2) Solenoids, lamps, motors are connected to
(A) Analog input
(B) Analog output
(C) Digital input
(D) Digital output
(3) How the instruction -] N [- in the PLC language work?
(A) It detects the signal state from 0 to 1.
(B) It detects the signal state from 1 to 0 and remains close till signal is 0.
(C) It detects the signal state from 1 to 0 and remains close for one scan cycle only.
(D) When signal state is 1 this instruction remains close.
(4) Full name of DCS is?
(A) Designed Control System
(B) Distributed Control System
(C) Display Control System
(D) Dedicated Control System
 (5) For PLC’s scan cycle which one is correct?
(A) Program execute Output write  Input read
(B) Input read Output write  Program execute
(C) Output write  Input read  Program execute
(D) Input read  Program execute  Output write
(6) CPU 1214C has __ integrated digital inputs and __ digital outputs
(A) 10 & 12
(B) 12 & 14
(C) 12 & 10
(D) 14 & 10
(7) Programming language for PLC is..
(A) Function Block Diagram (FBD)
(B) Statement list (STL)
(C) Ladder
(D) All of the above.
 (8) What is full name of SCADA?
(A) Supervision Control and Data Acquire
(B) Supervisory Control and Data Administration
(C) Supervisory Control and Data Acquisition
(D) Super Control and Data Acquisition


(9) Digital input of CPU 1214C is..
(A) 12VDC
(B) 230VAC
(C) 24VDC
(D) 10VDC
(10) In S7-1214C CPU, default address of Analog Input Starts from _________.
(A) IW 256                     (B) IW 64                     (C) IW 112                       (D) IW 96
(11) PLC’s analog input/output has.
(A) 1 bit address
(B) 1 byte address
(C) 1 word address
(D) 1 double word address
(12) The PLCs were originally designed to replace..
(A) Analog controllers
(B) DCS
(C) Microcomputers
(D) Hardwired control
(13) In Counter when CV is equal to or greater than PV, then
(A) CU bit will set
(B) CU bit will reset
(C) QU bit will reset
(D) QU bit will set
 (14) In S7-1200, we define Timer value (PT) as ____________.
(A) T#1s                        (B) T1                             (C) IEC 0                           (D) S5t#1s
(15) When signal state changes from 0 to 1 in LD input of CTD (down counter), then…
(A) CV will reset
(B) PV will reset
(C) The value at CV is set to the value of PV
(D) The value at PV is set to the value of CV

(16) A control valve will receive _____ signal from an analog output module is the count is 27648. The module is configured for 0 to 10V.
(A) 10V                       (B) 5V                               (C) 8V                              (D) 7.5V
(17) The Real Data type comprises of _______ Bits.
(A) 8                               (B) 16                             (C) 32                               (D) 6
(18) Answer the following considering the network shown.




If I0.0 = 1 & I0.1 = 0 then status of Q0.0 = 0
If I0.0 = 0 & I0.1 = 1 then status of Q0.0 = 0
If I0.0 = 1 & I0.1 = 1 then status of Q0.0 = 1
(19) Write ladder logic for following conditions
When start PB is pressed, Motor Right will start and stop when LS1 (2) is activated. Then Motor left will start and stop when LS1 (1) is activated. When stop is pressed, it will stop.



(20) How many Signal modules we can connect in 1214C CPU? ______
      (A) 8                             (B) 10                    (C) 32                            (D) 11
(21) From following, which CPU is not available for S7-1200 PLC? ______
      (A) 1211C                            (B) 1212C                             (C) 1213C                          (D) 1215C
(22) Which answer names all the memory bytes addressed with MD 200?
     (A) MW 201,202               (B) MB 200                      (C) MB 200,201,202,203    (D) MB 200,201
(23) TIA Portal Software has Portal View &project View.

7 comments: