SCADA
system has the facility to handle different levels in the manufacturing plant.
Level 0:-Level
0 contains the field devices in the plant such as flow and temperature sensors,
and final control elements, such as control valves, final control elements.
Level 1:- Level
1 contains the controller’s industrialized input/output (I/O) modules, and
their associated distributed electronic processors.
Level 2:-Level
2 contains the supervisory computers, which collect information from processor
nodes on the system, and provide the operator control screens.
Level 3:- Level
3 is the production control level, which does not directly control the process,
but is concerned with monitoring production and targets.
Level 4:-
Level 4 is the production scheduling level.
Such a great read! I loved every bit of it. Keep doing the amazing work you’re doing! For more helpful content, feel free to visit our blog at EN19 (Heavy Duty) Forged Round Bar Supplier in Delhi
ReplyDeleteLooking forward to more posts from you.